How to Read an Electric Scooter Quotation: EXW, FOB and CIF, and What Is Actually Included
Two quotations can look 20% apart and cost the same. How to compare EXW, FOB and CIF like for like, and what to ask before you pay.

Two quotations can look far apart and cost the same
An importer comparing two quotations often sees a large gap and picks the cheaper one. Then the freight, the documents, the packing or the missing charger arrive — and the cheaper quotation turns out to be the more expensive order. The price was never the whole quotation. What is included, and on what terms, is the rest of it.
Before you compare prices, compare quotations like for like.
It helps to change the question you are asking. Instead of "which quotation has the lowest unit price?", ask "which quotation delivers the same scooter, in the same form, to the same point, with the same documents and the same parts included, at the lowest total cost?" Those are very different questions, and only the second one protects you. Every section of this guide is really one step in rebuilding two different-looking quotations into that second, comparable form.
Work on paper, not in your head. Make a simple table with one column per supplier and one row for each item in this guide: the Incoterm, the exact configuration, the charger, the shipping form, the packing, the documents, the spare parts, the sample terms, the payment stages and the lead time. Fill in each cell from the quotation itself — and where a cell is empty because the quotation does not say, write "not stated" rather than assuming it is included. In most comparisons, the cheapest-looking quotation is simply the one with the most "not stated" cells, and each of those cells is a cost or a delay that will appear later, after you have committed.
1. Know which price you are looking at
- EXW (Ex Works) — the price at the factory gate. You arrange and pay for everything after that: transport to the port, export handling, freight, insurance and import costs.
- FOB (Free on Board) — the price including delivery onto the vessel at the port of shipment. You arrange and pay for the sea freight, insurance and everything after arrival.
- CIF (Cost, Insurance and Freight) — the price including freight and insurance to your destination port. You still pay import duties, port charges and delivery from the port to your warehouse, unless the quotation says otherwise.
The same scooter can therefore carry three very different numbers. Ask every supplier to quote the same term, for the same configuration, so the comparison is honest — and ask in writing exactly which costs each term covers.
Here is how the misunderstanding usually happens, step by step. A buyer receives one quotation priced EXW and another priced CIF, compares the two unit prices directly, and chooses the EXW price because the number is lower. Only afterwards does the buyer add the transport to the port, the export handling, the sea freight and the insurance — costs the CIF quotation had already included — and discovers the two orders cost much the same, or that the "cheaper" one now costs more, bought in a hurry at whatever freight rate was available that week. Nothing dishonest happened. The two numbers were simply never measuring the same thing.
The decision criteria are practical, not theoretical. EXW gives you control of the whole journey and can suit a buyer who already has a trusted freight forwarder and regular shipments to combine — but it also puts every step, and every step's paperwork, on your side of the table, starting at the factory gate. FOB splits the work at the vessel: the supplier handles the goods to the port of shipment and onto the ship, and you control the sea freight and everything from arrival onwards, which suits buyers who have a forwarder they trust for the ocean leg. CIF is the simplest to budget from a single number, because freight and insurance to your destination port are inside the price — but simplest is not the same as cheapest, and you should still ask what insurance is included and what happens if you need to claim on it. Whichever term you choose, choose it deliberately, get every supplier quoting on that same term, and confirm in writing exactly which costs that term covers for this order — including who pays if goods are damaged or delayed at each stage, because that is where the real differences between suppliers often sit.
One more point that is easy to miss: the named place matters as much as the three letters. A quotation should name the port of shipment for FOB, and the destination port for CIF, in writing. The same term with a different port is a different cost. If a quotation gives you a term but no named port, that cell in your table is "not stated" — ask.
2. Check the configuration behind the price
A quotation is only comparable if the scooter behind it is the same:
- Motor, battery and top speed — on the Lubon LB-CS, the listed figures are a 1500W motor, lithium / lead-acid battery options (for example 60V/72V, 32Ah) and a listed top speed of 45 km/h — confirm every figure for your exact configuration, and record them on the quotation itself.
- Charger — plug type, voltage and chemistry matching your market and battery, included in the price or charged separately?
- Shipping form — fully assembled, SKD or CKD, and what is included in each kit. On the Lubon LB-CS, the listed CKD lead time is 15 days — confirm the form and the lead time for your exact configuration and quantity.
- Charging time — on the Lubon LB-CS the listed charging time is 4–6 hours; confirm it for your exact configuration.
If one quotation is cheaper because the battery, the charger or the packing is different, that is not a saving — it is a different product.
Work through the configuration line by line, because this is where unlike quotations hide. Battery first: chemistry, voltage and capacity all change the price and change the product your customer receives, so a quotation that just says "battery included" tells you almost nothing. Ask for the battery to be named on the quotation itself — chemistry, voltage and capacity — and ask whether the price changes between the options, so you are choosing knowingly rather than discovering the difference on arrival. Then the motor and top speed: confirm the figures for your exact configuration rather than relying on the headline figures for the model range, and have them recorded on the quotation. Then the charger: a charger with the wrong plug type for your market, or one not matched to the battery chemistry you ordered, is not a small detail — it is a vehicle your customer cannot charge properly. Confirm the plug type, voltage and chemistry in writing, and whether the charger is inside the unit price or an extra line.
Shipping form deserves its own careful look, because it changes both the price and the work waiting for you on arrival. A fully assembled vehicle, an SKD kit and a CKD kit are three different purchases even when the finished scooter is identical: they pack differently, they carry different freight costs, and they need different assembly work, tools and time at your end. Ask what is included in each kit — which parts arrive fitted, which arrive loose, and which you are expected to source yourself — and confirm the agreed form and the kit contents in writing. If you are comparing a fully assembled price from one supplier against a CKD price from another, you are not comparing two prices for the same thing until you have added your own assembly cost and time to the kit price.
The common mistake in this section is accepting a verbal upgrade. A supplier says on a call that a larger battery or a different charger "can be arranged," the buyer compares quotations as if it already had been, and the written quotation — the only document that governs the order — still describes the standard configuration. The rule is simple: if it is not written on the quotation, it is not part of the comparison and not part of the order. Ask for the revised quotation, in writing, every time the configuration changes.
3. Ask what is not in the price
- Documents — which certificates, test reports and customs documents come with the order, for your exact model and market, and are they included in the price? "We have all certificates" is not an answer. Which documents, for which model, issued by whom, and valid for which market?
- Packing and loading — how the vehicles are packed and protected, and whether pre-shipment and loading photos are included. Ask for photos of the actual packing and loading, not stock photos.
- Spare parts — is there a written spare-parts list with prices? Which parts are available, and how long do they take? A supplier who cannot answer before the sale will not answer after it either.
- Sample terms — can you order a sample first, on what terms, and does the sample price count against a later container order? Confirm it in writing.
Each of these four items is a cost that exists whether or not it appears on the quotation. Documents are the clearest example. Every market needs its own paperwork handled correctly at import, and the time to discover a missing document is before the order ships, not when the container is waiting at your port. So ask the question in its full form: which documents, for which exact model, issued by whom, and valid for which market — and whether they are included in the price or charged separately. Write the answers into your comparison table supplier by supplier. Do not assume that a document supplied for one model or one market covers another; confirm it for your exact model and your exact market, in writing.
Packing is the second hidden cost. How the vehicles are packed and protected decides how many arrive undamaged, and repair or replacement of transit damage comes out of somebody's margin — usually yours, if it was never discussed. Ask how the vehicles are packed for your chosen shipping form, what protection is used, and whether pre-shipment and loading photographs are included. Those photographs are not a courtesy; they are your evidence of how the goods left the factory, and they are far easier to agree before production than to request after a problem.
Spare parts are the third. A written spare-parts list with prices, available before you order, tells you two things at once: what your after-sales will actually cost, and how seriously the supplier treats after-sales at all. Ask which parts are available for your exact model, what they cost, and how long they take to supply — and ask which wear parts the supplier recommends you order together with the first vehicles, so your first customer's first worn part is already on your shelf. Where warranty questions come up in this conversation, treat them the same way: no warranty period is something to take from a brochure or a call, so confirm the warranty terms in writing, for your exact model and order.
Sample terms are the fourth, and they protect your largest decision. Before a container order, a sample lets you check the real vehicle against the quotation — the configuration, the charger, the packing, the documents. Confirm in writing: whether a sample is available, on what terms, what it includes, and whether any part of the sample price counts against a later container order. Then, when the sample arrives, check it against the written quotation line by line. A difference found on a sample is a conversation; the same difference found on a container is a dispute.
4. Compare the payment and delivery terms, not just the unit price
Confirm in writing: the payment stages and what each stage is tied to — sample approval, production photos, loading — the lead time, and what happens if delivery is late or the goods do not match the sample. For a first order, keep the payment in stages tied to verifiable steps, and get every term in writing. Never pay a full deposit to a personal account, or to a company name that differs from the one on the quotation.
Read the payment terms as a risk question: at each stage, what have you actually verified before that money leaves you? A sound structure for a first order ties each stage to something you can check — the sample approved, production photographs received, loading photographs received — so that payment follows evidence. If a quotation asks for a large payment tied to nothing verifiable, or pressures you to skip the sample and the photographs to "save time," treat that as information about the supplier, not as a discount opportunity.
Check the small print of delivery with the same care. The lead time should be stated for your exact configuration and quantity, in writing, and you should confirm what the lead time is counted from — the order, the deposit, or the sample approval can produce very different delivery dates from the same number of days. Confirm, too, what happens if delivery is late, and what happens if the goods do not match the approved sample: who pays for what, and how a correction is made. These clauses feel pessimistic to discuss before an order; after a problem, they are the only thing that matters, and they can only be agreed while both sides still want the order to happen.
Finally, do the payee check every time, without exception, including with suppliers you have used before: the account name you are asked to pay should match the company name on the quotation. If it does not, stop and ask for the explanation in writing before any money moves. This single check prevents one of the most expensive and least recoverable mistakes in importing.
Your like-for-like checklist
- Same Incoterm, same configuration, same quantity — in writing.
- Motor, battery, charger, shipping form and lead time listed on the quotation.
- Documents for your market listed in writing, with what is included in the price.
- Packing, loading photos and spare-parts list confirmed in writing.
- Payment stages tied to verifiable steps, in writing.
Use the checklist as a gate, not a formality: a quotation that cannot fill every line is not ready to be compared, and the missing lines are your next message to that supplier. When every supplier has answered the same questions in writing, the comparison usually becomes obvious — and it is often not the lowest unit price that wins, but the quotation with nothing hidden behind it.